Pre-operational verification and installation
Pre-operational verification and installation

Upon request Praber Srl team performs the whole installation of the Praber Certified press and provides all the necessary prescriptions for the area hosting the machineries, as well as detailing all the equipment essential for the implant.

Praber Srl boasts worldwide support quickly with timely schedule planning.

Praber Srl will send a team featuring specific skills in sight of each step.

The SAT (Site Acceptance Test) follows the installation phase completing the FAT (Factory Acceptance Test) at Praber premises before the shipment.

Praber SAT pattern is structured as follow:

  • Visual inspection of all components
  • Internal control of panels, in particular focusing on pressure, ventilation and hydraulic circuits
  • Check of ignition settings such as charges, engines, levels, etc
  • Mechanical movements and software verification, both individually and in sequence.
  • Assesment and validation of all safety devices and locks
  • Training of operators
  • Delivery of User Manuals

Moreover with a Praber Certified press you will take advantage of an Italian manufacturer’s know-how and expertise, thus ensuring the achievement of the expected result.